This is a job Jerry and I did recently. It was 88 ft. of hairpin/picket fencing with finials and collars on every picket. Also, 2 swing gates .We found item# FCS-89 in the Cunningham books, and it estimated one hour per running foot to fabricate this style of fencing. Jerry and I had it fabricated, primed, painted and installed in 4 1/2 days.
This is a job Chris fabricated and installed himself. The only thing I did was provide him detailed drawings based on his field measurements. There were 2 sets of gates on this job. This was also Chris' first driveway gate job.
A-Plus Welding and Fabrication Fronz Roberts
This is item# ER821 in the Cunningham Books. There was 109 linear ft. on this job, with 80 ft. straight and the rest raked. No painting, no installing. Just delivered. Fronz and I spent 2 1/2 days fabricating (31 man hours) and 4 hours loading, delivering and unloading. We also made bolt-on connections which the books don't mention and still beat their time by 75 hours.
ASK ME HOW!
Here's another one Chris fabricated and installed. Again, all I did was provide him with a set of drawings from his field measurements.